Why the cover under a North Highline house deserves a look
The houses here are old for King County. The county's North Highline Subarea Plan counts almost 60% of units built before 1969, against almost 40% countywide (p.31), and the plan's history section credits a wartime housing boom and the 1960s construction of SR 509 for much of that growth (p.17). Census survey data on median year built gives 1977 for the White Center CDP and 1974 for Boulevard Park.
A ground cover from those decades may be thin plastic laid loose, a cover patched over the years, or nothing at all. Plastic that has been crawled over by plumbers, cable installers and pest crews tears, slides off the walls and bunches in the corners, and every bare patch is soil breathing into the space. With the Sea-Tac station's normals at 39.34 inches of precipitation a year, about 75% of it from October through March, the soil under the house rarely dries out in winter.