What Washington's unvented rule lists
WAC 51-51-0408 amends section R408.3 of the residential code. It says vent openings are not required where the crawl space meets the items it lists, and it lists two, with no "and" or "or" between them:
- Exposed earth is covered with a continuous Class I vapor retarder, joints overlapped 6 inches and sealed or taped, edges extended at least 6 inches up the stem wall and attached and sealed, together with a radon system built to Appendix AF.
- Continuously operated mechanical exhaust runs at 1 cubic foot per minute for each 50 square feet of crawl space floor, discharging to the outside.
Because the text does not say outright how the two items combine, King County's building official confirms how it applies to a given house. Washington's version offers no dehumidifier option in place of the exhaust. A dehumidifier can be added to a sealed space, but it never replaces the exhaust fan.
Radon is part of item 1 for a reason. King County is not on the list of high-radon Zone 1 counties in WAC 51-51-60101, so the unvented path stays open here, with the radon piping still drawn in. The North Highline code guide walks through the rest of the code.