How much vent area does a small White Center house need?
A vented crawl space needs 1 square foot of net vent opening per 300 square feet of floor under WAC 51-51-0408, so a 900-square-foot postwar house needs about 3 square feet, with openings placed for cross ventilation. Over a Class I liner, with cross ventilation kept, the figure drops to 1 per 1,500, or 0.6 square feet.
Is clear plastic an acceptable ground cover under Washington code?
Clear plastic does not meet the plain wording of R408.1, which names six-mil black polyethylene or an approved equal. Heavier reinforced liners are accepted as equals. If an inspection report or a seller's note says "vapor barrier present", it is worth checking its color and thickness, and whether it reaches the walls.
Can a dehumidifier stand in for the exhaust fan in a sealed crawl space?
A dehumidifier cannot stand in for it in Washington. The state's amended R408.3 in WAC 51-51-0408 lists a continuously running exhaust fan at 1 cfm per 50 square feet and no dehumidification option in its place. A dehumidifier can be added to a sealed crawl space, but the exhaust stays, and King County's building official confirms how the section applies.
Does King County require radon mitigation in a crawl space?
King County is not one of the seven Zone 1 counties in WAC 51-51-60101, so a vented crawl space carries no radon system requirement there. The unvented path's first listed item does include a radon system under Appendix AF. A home test, as the EPA advises, is the only way to know a house's level.
What R-value does the energy code ask for under the floor?
The Washington State Energy Code sets R-30 for floors over crawl spaces, in Table R402.1.3, installed in contact with the subfloor or filling the cavity. Replacing fallen batts is a chance to meet that figure, provided the joists are deep enough or the batts are held tight against the subfloor.
Do old posts on blocks have to be brought up to today's code?
Existing posts do not have to be rebuilt to today's code just because they are old, but any post replaced now follows current rules, including decay-resistant wood close to the ground under IRC R317. A soft or split post is a structural question, and a structural contractor should look at it.